Day 3:      August 14, 2002

Here are Fernando and Victor installing the first tiles at 7:00 AM. They begin dead center and work out to the sides.

This is what it looked like at quitting time. Approx. 500 tiles installed. Its the cutting that is slow. Both Fernando and Victor are doing a great job. Some of the tiles require many cuts.

A close up of the center of the mural.
BTW; They started at the center and made it to the ends without a cut except around the hands and arms.
Each end has a full tile.
The Mural is 50'-1-1/2" long.
Each row is 150 tiles.

Their spacing was perfect!